Jack,
Thank you for your input. All comments will be reviewed for incorporation into the Amended Long Term Control Plan as appropriate. Responses to comments will be included in the Comment Registry upon completion of the Plan. The Comment Registry, including the response to comments, will be included as an Appendix to the Amended LTCP.
Reservoir
From "Clean It! Lancaster's Combined Sewer Overflow Control Plan"
Go to the project
There was a large Reservoir at the water works years ago. The information was passed on to the Mayor.
I always thought if a Reservoir and/or the Quarry, owned by the County, could be utilized as a high water flood retention system, this could ease the overflow issue.