Eastbound Connector Phase 2: Shippen to Riverside

Project Description

East Bound Connector Route: Phase 2 is part of the City Bicycle Network and the regional Lancaster Heritage Pathway trail network. This segment will run between existing bicycle infrastructure on Shippen Street and planned infrastructure at Riverside Avenue. It will also consider improvements to north-south connections to the McCaskey campus. The route will be designed to create a safe pathway and crossings for bicyclists, pedestrians, and other vulnerable road users. There are several potential routes the path could take, including segments of East Fulton Street, E. Chestnut Street, East Marion Street, E. Orange Street, and Alleys 122 & 123.

Contact: Emma Hamme, Transportation Planner, City of Lancaster: emhamme@cityoflancasterpa.gov

Phases

Phases overview
Data Collection & Assessments
Public Engagement 1 - Ideas & Discussion
Processing & Design
Public Engagement 2 - Preferred Option Review
Report Back & Next Steps

Data Collection & Assessments

December 1, 2024 - February 11, 2025

During this phase, the staff and consultant team will gather data and information about the possible routes for the Eastbound Connector between Shippen Street and Riverside Ave.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    1 event has loaded.