Skip to main content

Eastbound Connector Phase 2: Shippen to Riverside

Project Description

East Bound Connector Route: Phase 2 is part of the City Bicycle Network and the regional Lancaster Heritage Pathway trail network. This segment will run between existing bicycle infrastructure on Shippen Street and planned infrastructure at Riverside Avenue. It will also consider improvements to north-south connections to the McCaskey campus. The route will be designed to create a safe pathway and crossings for bicyclists, pedestrians, and other vulnerable road users. There are several potential routes the path could take, including segments of East Fulton Street, E. Chestnut Street, East Marion Street, E. Orange Street, and Alleys 122 & 123.

Contact: Emma Hamme, Transportation Planner, City of Lancaster: emhamme@cityoflancasterpa.gov

Phases

Phases overview
Data Collection & Assessments
Public Engagement 1 - Ideas & Discussion
Processing & Design
Public Engagement 2 - Preferred Option Review
Report Back & Next Steps

Report Back & Next Steps

October 1, 2025 - October 31, 2025

During this phase the final recommendations and report will be provided to the public.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    1 event has loaded.